Balanced Development Portal

Project Details

Project Details

Tancheon-Han River Improvement and Tancheon Pedestrian Bridge Construction

Project Location
Area between Tancheon Samsung Bridge and Han River confluence
Purpose
  • Restoring natural features of Tancheon banks and Han River waterfront and creating waterfront leisure cultural spaces

  • Constructing new pedestrian bridge spatially integrating International Exchange Complex District divided by Tancheon

Areas
630,000㎡ ※ Pedestrian Bridge: Length 280m, Width approximately 15m
Project Scale
  • Tancheon-Han River improvement: Tancheon (Han River confluence-Samseong Bridge) L=974m (No.0+0000+974)
    Han River (Cheongdam Bridge-Sports Complex) L=1,690m (No.51+60053+290)

  • New Tancheon Pedestrian Bridge: Length: 280m, Width: approximately 15m
    Starting point: Tancheon West Road (Seoul Medical Center public space)~End point: Tancheon East Road (International Exchange Complex District main pedestrian axis)

Development Preview
  • Han River-Tancheon Area

  • Tancheon Pedestrian Bridge