Northeast Region Infrastructure Expansion
Development Background
Emerged need to establish efficient east-west connection system due to expected increase in floating population and traffic volume according to Changdong-Sanggye urban regeneration activation plan
Vision and Goals
Establishing efficient east-west connection system by constructing Dongbu Expressway underground tunnel and promoting user convenience and regional economic revitalization by improving accessibility to Jungnangcheon Stream
Project Overview
Location | Dongbu Expressway (Changdong Bridge~Sanggye Bridge section) |
---|---|
Scale | 3-4 lanes, length 1,700m (Underground tunnel structure: 1,356m, Top park 800m) |
Project Period | '16. 3. ~ '27. 1. |
Implementation Timeline
Conducted northeast region development future traffic demand analysis and road basic concept service | ’14. 12.~’15. 10. |
Established basic plan for Changdong-Sanggye east-west connection road
|
’16. 3.~’17. 9. |
Announced Changdong-Sanggye urban regeneration activation plan | ’17. 3. |
Completed basic design service for Eastern Arterial Road underground tunnel | ’17. 12.~’18. 12. |
Conducted feasibility study and various reviews for underground tunnel installation | ’18. 12.~’19. 11. |
Announced construction bid | ’20. 3. 11. |
Submitted bid and technical proposal/Held design evaluation meeting
|
’20. 7. 10. / 31. |
Initiated detailed design, commenced priority construction (relocation of obstructing facilities, etc.) | ’20. 8. 14. / 28. |
Created and announced implementation plan and topographical map (Seoul Metropolitan City Public Notice No. 2021-338) | ’21. 7. 8. |
Changdong-Sanggye East-West Connection Bridge
Development Background
Emerged need to establish efficient east-west connection system due to expected increase in floating population and traffic volume according to Changdong-Sanggye urban regeneration activation plan
Vision and Goals
Establishing efficient east-west connection system by constructing Changdong-Sanggye east-west connection bridge and promoting cultural arts sharing and industrial exchange through securing access roads to Arena and other facilities
Project Overview
Location | Between 1-11 Changdong, Dobong-gu ~ 820 Sanggye-dong, Nowon-gu |
---|---|
Scale | Construction of 2 bridge
Pedestrian-vehicle bridge (width 32m, length 118m) Pedestrian bridge (width 10m, length 110.5m) |
Project Period | ’16. 3. ~ ’26. 6.
|
Implementation Timeline
Established basic plan (concept) for Changdong-Sanggye east-west connection road service | ’16. 3.~'17. 9. |
Planned connection bridge construction design competition
|
’18. 8. 14. |
Announced design competition (International open competition, 60 days) | ’19. 5. 2. |
Contracted basic and detailed design service | ’19. 8. 14 |
Completed basic design | ’20. 7. 14. |
Transferred detailed design and construction implementation duties (→City Basic) | ’20. 7. 15. |
Conducted detailed design and various reviews | ’20. 8. 5. ~ 11. |
Contracted and commenced construction and construction project management service (City Basic) | ’21. 3.~ 4. |